Capital Projects Archives - SAGE http://www.washington.edu/research/tools/sage/tag/capital-projects/ System to Administer Grants Electronically Thu, 30 Jun 2022 23:22:14 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 Capital Projects Costs /research/tools/sage/guide/sage-budget/legacy/capital-projects-costs/ Thu, 21 May 2020 20:58:02 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6973 The (10) Capital Projects line item is used for costs for the design and construction of buildings. These expenses include land acquisition, design, project management, and […]

The post Capital Projects Costs appeared first on SAGE.

]]>
The (10) Capital Projects line item is used for costs for the design and construction of buildings. These expenses include land acquisition, design, project management, and site work. They also include art work, fixed equipment, and furnishings.

Line Setup

ճSetupmodal displays theDescriptionԻUWSub-Object Codeselected.

ճCascade Entriescheckbox will be checked if “Cascade entries on non-salary items” was selected.

AnyNotesassociated with this line item will display.

Update Periods

Values entered for theDescriptionand the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.