Update Periods Archives - SAGE http://www.washington.edu/research/tools/sage/tag/update-periods/ System to Administer Grants Electronically Thu, 06 Apr 2023 23:04:55 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 Student Aid Tuition and Fees Costs /research/tools/sage/guide/sage-budget/legacy/student-aid-tuition-and-fees-costs/ Sat, 23 May 2020 00:07:19 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6979 ճ(08) Tuition and Fees line is used for tuition costs. Line Setup ճSetupmodal displays theDescription. The specific sub-object code for Tuition and Fees (08-05) will have […]

The post Student Aid Tuition and Fees Costs appeared first on SAGE.

]]>
ճ(08) Tuition and Fees line is used for tuition costs.

Line Setup

ճSetupmodal displays theDescription. The specific sub-object code for Tuition and Fees (08-05) will have automatically pre-populated.

ճCascade Entriescheckbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotesassociated with this line item will display.

Update Periods

Values entered for theDescriptionand the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Academic Quarter Tuition Rate
  • Number of Academic Quarters
  • Academic Tuition Amount
  • Summer Quarter Tuition Amount
  • Increase % (Academic & Summer)
  • Total Tuition

The overall total for the line item displays in the Summary ($) column at the far right.

The post Student Aid Tuition and Fees Costs appeared first on SAGE.

]]>
6979
APL Costs /research/tools/sage/guide/sage-budget/legacy/apl-costs/ Fri, 22 May 2020 23:52:14 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6975 The (19) APL line item is used for expenditures related to the Applied Physics Lab (APL). Line Setup The Setup modal displays the Description and 91̽[…]

The post APL Costs appeared first on SAGE.

]]>
The (19) APL line item is used for expenditures related to the Applied Physics Lab (APL).

Line Setup

The Setup modal displays the Description and 91̽Sub-Object Code selected.

ճCascade Entriescheckbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotesassociated with this line item will display.

Update Periods

Values entered for theDescriptionand the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The Prorated Direct Costs line item (19-10) appears on the budget worksheet if the box for Budget includes Applied Physics Lab (APL) on the was checked.

The current PDC Rate displays when its box is checked. The value for each period on the worksheet is equal to the PDC rate multiplied by the total amount for Salaries less any amount for Sea Pay. These values are read-only.

For 19-00 (Dept. Admin. Overhead) and 19-20 (Accrued VAC/SL) lines, the total amount for each period will display.

Note: the (19-40) Department Fixed Fee line appears as the last line item of the budget if the box for Budget includes Fixed Fee on the was checked. The default rate is used to determine the Fixed Fee Value (FFV), which is equal to the Fixed Fee Rate (FFR) multiplied by the sum of the Facilities and Administrative Costs (F&A) and the Total Direct Costs (TDC).

FFV = FFR * (F&A + TDC)

The FFV is then added to the sum of the TDC and F&A to calculate the Total Project Cost (TPC).

TPC = FFV + F&A + TDC

The post APL Costs appeared first on SAGE.

]]>
6975
Student Aid Stipend Costs /research/tools/sage/guide/sage-budget/legacy/student-aid-stipend-costs/ Thu, 21 May 2020 21:33:48 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6981 ճ(08-02) Stipends line is used for student stipend costs. Stipends are not associated with a specific student. Line Setup ճSetupmodal displays theDescriptionԻUWSub-Object Codeselected. ճCascade Entriescheckbox will […]

The post Student Aid Stipend Costs appeared first on SAGE.

]]>
ճ(08-02) Stipends line is used for student stipend costs. Stipends are not associated with a specific student.

Line Setup

ճSetupmodal displays theDescriptionԻUWSub-Object Codeselected.

ճCascade Entriescheckbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotesassociated with this line item will display.

Update Periods

Values entered for theDescriptionand the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Number of Stipends
  • Stipend Amount
  • SubTotal
  • Increase (%)
  • Period Inflation
  • Total

The calculations are:

  • Period Subtotal = Number of Stipends times Stipend Amount
  • Total = Period Subtotal plus (General Inflation Rate (%) times Period Subtotal)

The post Student Aid Stipend Costs appeared first on SAGE.

]]>
6981
Unallocated Costs /research/tools/sage/guide/sage-budget/legacy/unallocated-costs/ Thu, 21 May 2020 21:22:19 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6977 ճ(38) Unallocatedline item is used for any expense not covered by the other codes in the budget. Line Setup The Setup modal displays the Description and […]

The post Unallocated Costs appeared first on SAGE.

]]>
ճ(38) Unallocatedline item is used for any expense not covered by the other codes in the budget.

Line Setup

The Setup modal displays the Description and UW Sub-Object Code selected.

The Cascade Entries checkbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotes associated with this line item will display.

Update Periods

The Description displays for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Amount
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Unallocated Costs appeared first on SAGE.

]]>
6977
Capital Projects Costs /research/tools/sage/guide/sage-budget/legacy/capital-projects-costs/ Thu, 21 May 2020 20:58:02 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6973 The (10) Capital Projects line item is used for costs for the design and construction of buildings. These expenses include land acquisition, design, project management, and […]

The post Capital Projects Costs appeared first on SAGE.

]]>
The (10) Capital Projects line item is used for costs for the design and construction of buildings. These expenses include land acquisition, design, project management, and site work. They also include art work, fixed equipment, and furnishings.

Line Setup

ճSetupmodal displays theDescriptionԻUWSub-Object Codeselected.

ճCascade Entriescheckbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotesassociated with this line item will display.

Update Periods

Values entered for theDescriptionand the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Capital Projects Costs appeared first on SAGE.

]]>
6973
Other Contractual Services Costs /research/tools/sage/guide/sage-budget/legacy/other-contractual-services-costs/ Thu, 21 May 2020 20:52:50 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6971 ճ (03) Other Contractual Services line is used for consultant travel, freight charges, or membership dues. Line Setup The Setup modal displays the Description and 91̽[…]

The post Other Contractual Services Costs appeared first on SAGE.

]]>
ճ (03) Other Contractual Services line is used for consultant travel, freight charges, or membership dues.

Line Setup

The Setup modal displays the Description and UW Sub-Object Code selected.

The Cascade Entries checkbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotes associated with this line item will display.

Update Periods

Values entered for the Description and the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Other Contractual Services Costs appeared first on SAGE.

]]>
6971
Service Contracts Costs /research/tools/sage/guide/sage-budget/legacy/service-contracts-costs/ Thu, 21 May 2020 20:48:56 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6968 The (02) Service Contracts line is used for research subject reimbursement or technical research services. Line Setup The Setup modal displays the Description and 91̽Sub-Object […]

The post Service Contracts Costs appeared first on SAGE.

]]>
The (02) Service Contracts line is used for research subject reimbursement or technical research services.

Line Setup

The Setup modal displays the Description and UW Sub-Object Code selected.

The Cascade Entries checkbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotes associated with this line item will display.

Update Periods

Values entered for the Description and the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Service Contracts Costs appeared first on SAGE.

]]>
6968
Equipment Costs /research/tools/sage/guide/sage-budget/legacy/equipment-costs/ Thu, 21 May 2020 20:42:48 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6963 The (06) Equipment lineis used for computing equipment, library materials such as books, software, and serials subscriptions. Line Setup The Setup modal displays the Description and […]

The post Equipment Costs appeared first on SAGE.

]]>
The (06) Equipment lineis used for computing equipment, library materials such as books, software, and serials subscriptions.

Line Setup

The Setup modal displays the Description and UW Sub-Object Code selected.

The Cascade Entries checkbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotes associated with this line item will display.

Update Periods

Values entered for the Description and the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Equipment Costs appeared first on SAGE.

]]>
6963
Supplies and Materials Costs /research/tools/sage/guide/sage-budget/legacy/supplies-and-materials-costs/ Thu, 21 May 2020 20:39:43 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6961 The (05) Supplies and Materials is used for supplies and materials, such as book, chemicals, office supplies, and non-capitalized equipment. Line Setup The Setup modal displays […]

The post Supplies and Materials Costs appeared first on SAGE.

]]>
The (05) Supplies and Materials is used for supplies and materials, such as book, chemicals, office supplies, and non-capitalized equipment.

Line Setup

The Setup modal displays the Description and UW Sub-Object Code selected.

The Cascade Entries checkbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotes associated with this line item will display.

Update Periods

Values entered for the Description and the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Supplies and Materials Costs appeared first on SAGE.

]]>
6961
Travel Costs /research/tools/sage/guide/sage-budget/legacy/travel-costs/ Thu, 21 May 2020 20:39:00 +0000 http://www.washington.edu/research/tools/sage/?post_type=oris_guide&p=6958 The (04) Travelline item is used for air fare, car rental, in- and out-of-state per diem, as well as international travel, and cash advance expenses. Line […]

The post Travel Costs appeared first on SAGE.

]]>
The (04) Travelline item is used for air fare, car rental, in- and out-of-state per diem, as well as international travel, and cash advance expenses.

Line Setup

The Setup modal displays the Description and UW Sub-Object Code selected.

The Destination field will display DomesticorForeign.

The Cascade Entries checkbox will be checked if “Cascade entries on non-salary items” was selected.

ԲNotes associated with this line item will display.

Update Periods

Values entered for the Description and the 91̽Sub-Object Codedisplay for reference.

The name of the period and its date range will display at the top of the period column.

The following values display for each period:

  • Quantity
  • Price
  • Period Subtotal
  • General Inflation Rate (%)
  • Period Inflation
  • Total

The overall total for the line item displays in the Summary ($) column at the far right.

The post Travel Costs appeared first on SAGE.

]]>
6958